Wetland · no spraying Work area · Block B Management desk ● Live SmartOps 38on site now 1block at risk 64%budget used 4open findings New · 12 clocked in · Block B New · 36 photos, GPS-tagged New · Safety inspection: PASS New · 2.4 ha worked today From the field to this desk, almost instantly
1Plan · projects, tasks, budgets, teams and work areas, set up in one pass
Draft v0.8 · 21 Oct 2026
SmartOps
Operations Suite

Plan the work. Control delivery. Prove the outcome.

One connected platform for field programmes that have to show their evidence

The problem

Most field programmes find out a month late

Paper, phones and spreadsheets Day 1Day 15Day 30 Problem starts · day 4 Noticed at month-end …and reported 1–3 months later With SmartOps Day 1Day 15Day 30 Seen the same day Fixed on day 5 Visible every day Illustrative: one problem, two ways of finding out

Attendance sits on paper registers until month-end. Photos live on personal phones. Site visits happen once a week, and reports are put together by hand from all of it.

1–3 monthshow far behind many organisations report on their field work
  • By the time a problem shows up in the numbers, it has usually grown.
  • Paying for work nobody can yet verify is a risk for clients, funders and contractors alike.
  • SmartOps closes the gap: work captured in the field reaches the office within minutes, often seconds.
The platform

One connected operational picture

Oneoperationalrecord
A block cleared of invasive plants, with hills behind
In the field · a cleared block

SmartOps connects planning, people, vehicles, equipment, finance, inspections, surveys and evidence. Everyone sees what was planned, what happened in the field, what it cost and what proves it.

Captured once, used everywhere. A clock-in from the field becomes the timesheet, the dashboard figure, the cost line and the report evidence, with no re-typing.

Built for government programmes, NGOs and corporates, and any organisation that has to prove the work before it is paid.

Invasive-plant controlRehabilitationConservationPublic worksEvidence-based payment
Mobile, offline-first

A field day, captured as it happens

05:45 ● Online SmartOps Prepare Today · Tuesday 21 October Block B · clearingTeam 3 · due 30 OctAssigned Block B · wetland edgeTeam 3 · hand-pull only · due 4 Nov Work-area maps3 boundaries · ready offline Safety documents6 files · ready offline VehiclePick-up · assigned to Team 3 Vehicle checklist Tyres and lightsFirst aid kitFire extinguisher ResultPASS Equipment scanned Tag scannedLocation updated Knapsack sprayers × 4Herbicide · label checkedFirst aid refill Clock in team You are inside Block B ✓ Team 3 · 12 of 12 selected Clock in · 06:52 Time, GPS location, project and task recorded Optional proof: biometric or QR check Trip in progress Odometer at startDriver checklistDistance so far 84 213 km38 km Today's work · Block B 2.4 ha Area worked today: 2.4 ha NOTEKept clear of the wetland edge 36 photos GPS-tagged Timed Safety inspection · Block B Safety glasses wornGloves and overallsChemicals labelledFirst aid kit on siteSpill kit available ResultPASS Photo and location attached A failed item becomes a corrective action Clock out team 12clocked out7 h 40 min on site DAY SUMMARY Area workedPhotosInspectionsTrips 2.4 ha361 · PASS1 · 64 km Back in signal 18 records uploaded Clock-ins, photos, work areas, inspection Office dashboard updated16:42 · no re-typing Almost instant once there's signal Sent straight away
  1. PrepareTasks, maps and safety documents are already on the phone
  2. MobiliseVehicle and equipment checks, scanned on the spot
  3. Clock inOne person or a whole team, with time and GPS location
  4. TravelTrips and odometer readings logged
  5. Capture workPhotos, notes and the area worked today
  6. Inspect or surveyStandard checklists and repeatable observations
  7. Clock outHours worked, linked to the task
  8. SynchroniseEverything uploads, almost instantly, when there's signal

No signal? No problem. Work carries on offline. Everything captured is saved on the phone and sent the next time there's a connection, with nothing lost and nothing typed twice.

Workforce clocking and timesheets

Know who's on site today, not at month-end

Live map · this morning
Attendance now
38Present
4Training
3Sick or leave
3Not clocked in
Timesheet builds itself
Up to 30 dayssooner to see attendance: it shows as crews clock in, not when the register comes back at month-end
  • Team leads clock in one person or a whole crew on the phone. Each clocking records time, GPS location, project and task, with optional proof such as a biometric or QR check.
  • Managers see who's present, in training, sick, on leave or absent as it happens.
  • Timesheets build themselves, every edit is audited, and labour is linked directly to the work it paid for.
  • The full history stays with the project from start to finish, ready to filter however you need.
Mapped work areas (geofencing)

Right crew, right place, right work

Block B · live
Dense invasive plants in a work block before clearing
A work block before clearing

Each task can carry its own mapped work area. Team leads see the boundary on their phone, so they know straight away if they've strayed outside it.

Before
Found at the next site visit: up to 1–2 weeks of work in the wrong place
With SmartOps
Seen on the office map the same day
  • Protects sensitive areas such as wetlands and rivers from herbicides and other chemicals.
  • Stops paying for effort in the wrong place, and for the rework that follows.
  • Optional checks mean a task can only start inside its work area, or after scanning a site QR code.
Task activity and daily work areas

Spot a slowdown from your desk

1 of 4

Every day’s work, mapped

“You can compare a day's work two weeks ago with yesterday's. If coverage has dropped by more than half, you can find out why at your desk, before you drive out to site.”Programme manager, invasive-plant control programme
Health, safety and quality

From unsafe photo to phone call in 10 minutes

2026-10-14 10:02 · Block B · GPS ✓ No safety glasses Glasses on ✓ 10:02Daily work photo takenin the field 10:05Synced. Manager spotsthe missing glasses 10:12Supervisor phoned:glasses on, inspection to follow Same dayFollow-up inspection logged:PASS Illustration based on a real event Before SmartOps: spotted at the next site visit, days later, if at all
“I saw a photo come through where the team weren't wearing safety glasses. Within ten minutes of the time stamp I'd called the supervisor on site: they needed to be wearing them, someone would be out later to inspect, and anyone without them would be sent off site.”Programme manager, invasive-plant control programme
  • Daily photos show safety and equipment problems early, so managers can act and plan ahead, reducing the risk of injury and liability.
  • Checklists you configure yourself: site progress, health and safety, vehicles, drivers, invoice sign-off.
  • A failed check becomes a corrective action with an owner, and stays open until it's rechecked and closed.
Financial and commercial control

Pay on proof

Budget against actual and committed spend, by month Illustrative figures

Budgets, supplier invoices, client invoices and income sit alongside the delivery record, so every cost and every claim has its evidence attached.

  • See budget, committed (approved but not yet paid) and actual spend each month, with the variance and next month's forecast.
  • Invoice sign-off checklists confirm the work was done before anything is approved.
  • Clients and funders who pay on evidence get time, location, photos and inspections behind every claim.
Finance and delivery in one view: no more reconciling a spreadsheet of costs with a separate pile of field reports.
Evidence reports

Reports for the period you're in, not three months ago

1+ dayof report writing saved each cycle, because the data is already in
  • Choose the purpose (monthly progress, compliance, close-out or financial performance), then the evidence to include.
  • Set the audience (board, client, funder or regulator) and how confidential it is. Draft, review and approve in one place.
  • Baseline, progress and close-out surveys show measurable change over time.
Where many organisations report 1–3 months behind, SmartOps reports on this period. Accurate, current reporting means problems are spotted, and dealt with, while they're still small.
Planning and oversight

Plan once. See problems while they're small.

  • A nine-step planning wizard sets up the project, timeline, tasks, budget, teams, vehicles, equipment, work areas and quality checks in one pass, or imports an existing Excel plan.
  • Views for every role: Executive, Project manager and Operations.
  • Exceptions surface on their own: overdue work, failed checks, budget variance, unassigned tasks, vehicles in the workshop.
  • Click any headline straight through to the record behind it. Reminders keep deadlines, services and corrective actions from slipping.
Institutional memory: decisions, documents, corrections and follow-ups stay with the project, even when people move on.
At a glance

Act earlier, work more efficiently, and prove what was delivered

Same dayattendance visibility, instead of month-end (up to 30 days sooner)
1–2 weeksearlier detection of crews working in the wrong area
10 minfrom an unsafe-practice photo to a call with the supervisor
1+ dayof report writing saved each cycle
One operational pictureDefensible evidenceEarlier interventionLess administration Stronger accountabilityBetter client confidenceInstitutional memoryOffline-first in the field

MOAT SmartOps is a connected operations platform for organisations delivering complex work across projects and field teams. It brings planning, people, vehicles, equipment, finance, inspections, surveys and evidence into one operating context.

SmartOps
Operations Suite
Contact us to find out more ›

Draft v0.8 · 21 October 2026. Figures and quotes come from users' experience on an invasive-plant control programme. Photos are from that programme's field records, used with permission, and show no people or client details that can be identified. Illustrations are simplified, maps and numbers are illustrative, and no client data is shown. For the animations, open this file in a web browser (Chrome, Edge, Safari or Firefox) rather than an email preview. To save a PDF, print it (Ctrl+P) in landscape.

Scroll, swipe, use the arrow keys, or tap › to turn the page